What's in the Box?
- (1) Top Head Ventilation System
- (1) Vent NVG Top Head Ballistic Panel
How to Install:
To install, remove your current NVG shroud headpiece and replace it with the Top Head Ventilation system. Once that is in place, you will take the Vent NVG Top Head Ballistic panel, a ballistic plate certified by the NIJ as level IIIA, and attach that over the Vent System.